CEB instructionals to be transfered to Make Projects: Difference between revisions
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
=Ready To Transfer= | =Ready To Transfer= | ||
The following pages are ready to be transfered to make. Items which can be grouped into one make page are listed together. The text will not change: | The following pages are ready to be transfered to make. Items which can be grouped into one make page are listed together. The text will not change: | ||
*Make page titled "Support system": [[CEB Press/Manufacturing Instructions/Leg Holders|Leg Holders]], [[CEB Press/Manufacturing Instructions/Legs|Legs]], [[CEB Press/Manufacturing Instructions/Feet|Feet]], [[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]] | |||
*Hopper and grate supports: [[CEB Press/Manufacturing Instructions/Grate mounts|Grate Mounts]], | |||
*Make page titled Support system: [[CEB Press/Manufacturing Instructions/Leg Holders|Leg Holders]], [[CEB Press/Manufacturing Instructions/Legs|Legs]], [[CEB Press/Manufacturing Instructions/Feet|Feet]], [[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]] | |||
=Completed= | =Completed= |
Revision as of 23:45, 13 December 2011
Transfer instructions
- Please transfer the Required tools and materials to the introduction.
- Break the steps appropriately for the new guide.
- Images aren't necessary- I'll take care of them once we get the final sketchup version of the CEB and the 2D cad drawings.
- Please edit this page and place a check (
) next to the page when the text transfer is complete.
- When the images are all uploaded, I will move the link to the completed section.
Ready To Transfer
The following pages are ready to be transfered to make. Items which can be grouped into one make page are listed together. The text will not change:
- Make page titled "Support system": Leg Holders, Legs, Feet, Arms - secondary
- Hopper and grate supports: Grate Mounts,