Marcin Log: Difference between revisions
Jump to navigation
Jump to search
Line 40: | Line 40: | ||
=12/24/11= | =12/24/11= | ||
*CEB Operational Safety--An Introduction | *CEB Operational Safety--An Introduction | ||
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//suxEJFXj1b4" frameborder="0" allowfullscreen></iframe></html> | <html><iframe width="560" height="315" src="https://www.youtube.com/embed//suxEJFXj1b4" frameborder="0" allowfullscreen></iframe></html> | ||
*Proper safety for operating the CEB | *Proper safety for operating the CEB | ||
*Safety is critical for this BETA RELEASE of the CEB Press despite 150+ hours of field testing | *Safety is critical for this BETA RELEASE of the CEB Press despite 150+ hours of field testing | ||
Line 48: | Line 50: | ||
*Lifetrac Tractor Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction | *Lifetrac Tractor Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction | ||
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//LqLzR9j1Ngs" frameborder="0" allowfullscreen></iframe></html> | <html><iframe width="560" height="315" src="https://www.youtube.com/embed//LqLzR9j1Ngs" frameborder="0" allowfullscreen></iframe></html> | ||
*Proper safety for operating the Lifetrac Tractor | *Proper safety for operating the Lifetrac Tractor | ||
*Safety is critical for this BETA RELEASE of the Lifetrac despite 150+ hours of field testing | *Safety is critical for this BETA RELEASE of the Lifetrac despite 150+ hours of field testing | ||
Line 58: | Line 62: | ||
*Soil Pulverizer Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction | *Soil Pulverizer Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction | ||
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//x3asQWfRtx0" frameborder="0" allowfullscreen></iframe></html> | <html><iframe width="560" height="315" src="https://www.youtube.com/embed//x3asQWfRtx0" frameborder="0" allowfullscreen></iframe></html> | ||
*Proper safety for operating the Soil Pulverizer | *Proper safety for operating the Soil Pulverizer | ||
*Safety is critical for this BETA RELEASE of the Soil Pulverizer despite 150+ hours of field testing | *Safety is critical for this BETA RELEASE of the Soil Pulverizer despite 150+ hours of field testing | ||
Line 69: | Line 75: | ||
*Power Cube Operation, Safety, Maintenance, Troubleshooting, and Repair Introductions | *Power Cube Operation, Safety, Maintenance, Troubleshooting, and Repair Introductions | ||
<html><iframe width="560" height="315" src="https://www.youtube.com/embed//HTNZdu0mMdc" frameborder="0" allowfullscreen></iframe></html> | <html><iframe width="560" height="315" src="https://www.youtube.com/embed//HTNZdu0mMdc" frameborder="0" allowfullscreen></iframe></html> | ||
*Proper safety for operating the Power Cube | *Proper safety for operating the Power Cube | ||
*Safety is critical for this BETA RELEASE of the Power Cube despite 150+ hours of field testing | *Safety is critical for this BETA RELEASE of the Power Cube despite 150+ hours of field testing | ||
Line 78: | Line 86: | ||
*Construction in Progress - Results of 2011 | *Construction in Progress - Results of 2011 | ||
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//gSpMm6CoDac" frameborder="0" allowfullscreen></iframe></html> | <html><iframe width="420" height="315" src="https://www.youtube.com/embed//gSpMm6CoDac" frameborder="0" allowfullscreen></iframe></html> | ||
*Summary of results for 2011 | *Summary of results for 2011 | ||
*Significant CEB construction completed in 2011 with HabLab (which is almost complete) | *Significant CEB construction completed in 2011 with HabLab (which is almost complete) | ||
Line 87: | Line 97: | ||
*Unsuccessful with cinder-block replacement pressing with reject Lime | *Unsuccessful with cinder-block replacement pressing with reject Lime | ||
*Explanation of overall brick-pressing, brick-laying and mortaring experience and construction techniques discovered while building the HabLab | *Explanation of overall brick-pressing, brick-laying and mortaring experience and construction techniques discovered while building the HabLab | ||
=12/23/11= | =12/23/11= |
Revision as of 17:22, 6 January 2012
Archive
01/05/12
- Window Framing*
01/02/12
12/31/11
12/30/11
- Published announcement for Co-Founder recruitment
12/29/11
- Open Source Ecology Enterprise Plan for 2012
- OSE Enterprise platform for fostering of economic best practices
- Explanation of OSE, GVCS and phases needed for success
- Summing up of work done in 2011
- Month-by-month development roadmap of 2012 OSE Goals, including projected costs
12/24/11
- CEB Operational Safety--An Introduction
- Proper safety for operating the CEB
- Safety is critical for this BETA RELEASE of the CEB Press despite 150+ hours of field testing
- Recommend to work in pairs or teams, proper protection needed, heavy-machine experience needed
- Step-by-Step safety instructions from Marcin for anyone operating the CEB Press
- Lifetrac Tractor Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction
- Proper safety for operating the Lifetrac Tractor
- Safety is critical for this BETA RELEASE of the Lifetrac despite 150+ hours of field testing
- Recommend to work in a pair or as a team--not alone, proper protection needed, heavy-machine experience needed
- Step-by-Step safety instructions from Marcin for anyone operating the Lifetrac
- Basic Tractor operation techniques
- Soil Pulverizer Operation, Safety, Maintenance, Troubleshooting, and Repair Introduction
- Proper safety for operating the Soil Pulverizer
- Safety is critical for this BETA RELEASE of the Soil Pulverizer despite 150+ hours of field testing
- Recommend to work in a pair or as a team--not alone, proper protection needed, heavy-machine experience needed
- Step-by-Step safety instructions from Marcin for anyone operating the Soil Pulverizer
- Basic Soil Pulverizer operation techniques and best practices
- Power Cube Operation, Safety, Maintenance, Troubleshooting, and Repair Introductions
- Proper safety for operating the Power Cube
- Safety is critical for this BETA RELEASE of the Power Cube despite 150+ hours of field testing
- Recommend to work in a pair or as a team--not alone, proper protection needed, heavy-machine experience needed
- Step-by-Step safety instructions from Marcin for anyone operating the Power Cube
- Basic Power Cube operation techniques and best practices
- Construction in Progress - Results of 2011
- Summary of results for 2011
- Significant CEB construction completed in 2011 with HabLab (which is almost complete)
- Prototyping being done in workshop
- Explanation, philosophy, materials, outcomes and successes of CEB Construction
- Successful use of CEB Press and Soil Pulverizer
- Unsuccessful with cinder-block replacement pressing with reject Lime
- Explanation of overall brick-pressing, brick-laying and mortaring experience and construction techniques discovered while building the HabLab
12/23/11
- Quick Attach Wheel Assembly Walk-through*
- Walk-through explanation of detachable quick-attach wheel motor unit for heavy-duty machines
- motor, bolts, structure, hub, splined, shaft, couplers, collars, washers, bearings, Lifetrac frame,
12/22/11
12/21/11
- Quick Attach Wheel 1*
- Explanation of new motor assembly for detachable motor for Lifetrac
- Qc wheel 2
- Qc wheel 3
- Qc wheel 4
- Qc wheel 5
- Qc wheel 6
- Qc wheel 6.1
- Qc wheel 7
- Qc wheel 8
- Qc wheel 9
- Qc wheel 10
- Qc wheel 11
- Qc wheel 12
- Qc wheel 13
- Qc wheel 14
- Qc wheel 15
- Qc wheel 17
- Qc wheel 18
- Qc wheel 19
- Qc wheel 20
- Qc wheel 21
- Qc wheel 22
- Qc wheel 23
- Qc wheel 24
- Qc wheel 25
- Qc wheel 26
- Qc wheel 27
- Qc wheel 28
- Qc wheel 29
12/19/11