OSE Christmas Gift to the World 2011: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
*Beta release of [[CEB Press]], [[Tractor]], [[Power Cube]], and [[Soil Pulverizer]] by December 24, 2011. | *Beta release of [[CEB Press]], [[Tractor]], [[Power Cube]], and [[Soil Pulverizer]] by December 24, 2011. | ||
**Complete documentation - 3D CAD, 2D fabrication drawings, exploded part diagrams | **Complete documentation - 3D CAD, 2D fabrication drawings, exploded part diagrams; some CAM files for open source [[torch table]] | ||
*Demonstration of natural housing using CEB - see [[HabLab]] | *Demonstration of natural housing using CEB - see [[HabLab]] | ||
Revision as of 20:06, 1 December 2012
From http://blog.opensourceecology.org/2011/12/ose-christmas-gift-to-the-world/ :
The Gift of OSE to the World in 2011 is the closure of the basic agriculture/construction prototyping cycle:
- Beta release of CEB Press, Tractor, Power Cube, and Soil Pulverizer by December 24, 2011.
- Complete documentation - 3D CAD, 2D fabrication drawings, exploded part diagrams; some CAM files for open source torch table
- Demonstration of natural housing using CEB - see HabLab
See also the GVCS Rollout Plan and Kickstarter and Civilization_Starter_Kit_DVD_v0.01