Power Cube VIII Collaborative Production Run: Difference between revisions
Jump to navigation
Jump to search
(→Date) |
(→Date) |
||
Line 5: | Line 5: | ||
*Slated for Thu-Fri Nov 1 - 2 | *Slated for Thu-Fri Nov 1 - 2 | ||
*[[Tom Griffing]] is [[Guest Collaborative Production Run Director]] | *[[Tom Griffing]] is [[Guest Collaborative Production Run Director]] | ||
=BOM= | |||
=Fabrication Diagram= |
Revision as of 20:46, 22 October 2012
Tom is currently building Power Cube VII - optimizing form factor for ergonomics. The power cube after that is Power Cube VIII. See Machine Naming Convention.
Date
- Slated for Thu-Fri Nov 1 - 2
- Tom Griffing is Guest Collaborative Production Run Director