Bulldozer/Manufacturing Instructions: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (→valves)  | 
				 (→valves)  | 
				||
| Line 9: | Line 9: | ||
two copies for 6 spool joystick valve  | two copies for 6 spool joystick valve  | ||
[[File:Screencap-valvemount1.png|400px]]  | [[File:Screencap-valvemount1.png|400px]]  | ||
one of each for 2 spool valve  | one of each for 2 spool valve  | ||
[[File:Screencap-valvemount2.png|400px]]  | [[File:Screencap-valvemount2.png|400px]]  | ||
Revision as of 00:07, 25 June 2013
Modules
Cab
valves
four 4x16 plates from warehouse
two copies for 6 spool joystick valve
one of each for 2 spool valve
Bed
Under side
Parts
- 4x4
- 4 80"
 - 2 72"
 
 - 8 Hinge Plates
 - 2 QA mounts
- 2 QD-SDS
 - 2 11T
 
 - 2 Geardown modules
- 2 45T
 - 1 Wheel mount
 - 1 Wheel
 
 
- space the 72" 4x4s 80" apart
 - set two of the 80" 4x4s at either end of th 72" 4x4s
 - bolt corners together
 - set two 80" 4x4s 4inches inward from the first two
 - bolt together
 
- place four of the hinge plates on the outer verticle face of the 72" 4x4s
 - bolt together
 - repeat on opposite 72"
 
- mount quick attach wheel module 12inches from from the front of the left side 80" 4x4s
 - mout geardown module 8inches from quick attach wheel module
 - on opposite side mount the quick attach wheel module 44inches from the front
 - mount the geardown module 8inches in front of the quick attach wheel module
 
- install the pivot shaft
 
Wheels
Groundhug Pivot
Pivot