The Spark Build: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
*Cross-stabilization of loader forearms | *Cross-stabilization of loader forearms | ||
*Force on arm lift cylinder mounting | *Force on arm lift cylinder mounting | ||
*Foot pedal detail | |||
*Valve 1 mounting detail | |||
*Valve 2 mounting detail | |||
*Seat mounting | |||
*Wheel shaft procedure | |||
* | * | ||
Revision as of 19:28, 11 July 2013
Quality Control
- Download File:Cab and Loader Arms 12pm Jul 11.skp
- Cross-stabilization of loader forearms
- Force on arm lift cylinder mounting
- Foot pedal detail
- Valve 1 mounting detail
- Valve 2 mounting detail
- Seat mounting
- Wheel shaft procedure
Parts
First Choice
- 3 Spool, 25 gpm Motor Valve for Wheels, auxiliary implements, and turning - [1]. Needs Power Beyond Sleeve - [2]
- 25 GPM Joystick valve - [3]
- [4] hoses - [4]
- [2] hoses - [5]