Line 4: | Line 4: | ||
*Cross-stabilization of loader forearms | *Cross-stabilization of loader forearms | ||
*Force on arm lift cylinder mounting | *Force on arm lift cylinder mounting | ||
**9 degree cylinder angle | **9 degree cylinder angle means 9400 lbs lift force | ||
*Foot pedal detail | *Foot pedal detail | ||
*Valve 1 mounting detail | *Valve 1 mounting detail |
Revision as of 19:50, 11 July 2013
Quality Control
- Download File:Cab and Loader Arms 12pm Jul 11.skp
- Cross-stabilization of loader forearms
- Force on arm lift cylinder mounting
- 9 degree cylinder angle means 9400 lbs lift force
- Foot pedal detail
- Valve 1 mounting detail
- Valve 2 mounting detail
- Seat mounting
- Wheel shaft procedure
- Loader down pressure
- Bolts clearing everywhere
- Bolting feasibility everywhere
- Build order correct for each module
- Build order correct for complete assembly
Parts
First Choice
- 3 Spool, 25 gpm Motor Valve for Wheels, auxiliary implements, and turning - [1]. Needs Power Beyond Sleeve - [2]
- 25 GPM Joystick valve - [3]
- [4] hoses - [4]
- [2] hoses - [5]