Prototype Assessment: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 19: | Line 19: | ||
*What quality control measures were taken throughout the build? | *What quality control measures were taken throughout the build? | ||
==Quality Assessment== | ==Quality Assessment== | ||
*Did the build pass [[Quality Control Checklist]] on the first pass? | *Did the build pass [[Quality Control Checklist]] on the first pass? What corrective measures had to be taken? | ||
==General== | ==General== | ||
*Describe your general level of satisfaction with the overall design/build and the resulting quality of the product. | *Describe your general level of satisfaction with the overall design/build and the resulting quality of the product. | ||
*What are the lessons learned for increasing the speed of the build. | *What are the lessons learned for increasing the speed of the build. |
Revision as of 02:25, 17 July 2013
Introduction
This is a template for documenting the lessons learned about a prototype build.
Assessment
Design Phase
- Describe the steps taken in the design process. What went well in the design phase? What could have been done better?
- Which steps in the design phase are easy to improve? Which are difficult to improve?
- Were there steps that should have been taken but were missing? Were there steps that were taken that should have been omitted? Explain.
- How did the design team feel about the design prior to the build and after the build?
- Describe what the ideal design process should look like.
Build Preparation
- Describe how the build preparation went.
- Were you satisfied with the build preparation phase?
- What were the issues that were encountered? How were they resolved?
Build Phase
- What worked as planned regarding the build? What didn't work as planned?
- Describe the build sequence. Were you happy with the sequence? What could have been improved about the sequence?
- Were people utilized effectively throughout the build?
- What quality control measures were taken throughout the build?
Quality Assessment
- Did the build pass Quality Control Checklist on the first pass? What corrective measures had to be taken?
General
- Describe your general level of satisfaction with the overall design/build and the resulting quality of the product.
- What are the lessons learned for increasing the speed of the build.