Rob Beddingfield Log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
=Wed, 30 Jul= | |||
*CEB V frame - modified model for frame to reflect cnc cut parts. | |||
*Finished core assembly, drawer assembly next | |||
=Mon, 29 Jul= | =Mon, 29 Jul= | ||
*CEB V frame - modified model for frame to reflect cnc cut parts. | *CEB V frame - modified model for frame to reflect cnc cut parts. |
Revision as of 06:20, 1 August 2013
Wed, 30 Jul
- CEB V frame - modified model for frame to reflect cnc cut parts.
- Finished core assembly, drawer assembly next
Mon, 29 Jul
- CEB V frame - modified model for frame to reflect cnc cut parts.
- still need to assemble top flange assembly
- Christmas_Gift_to_the_World