Design for Fabrication Review: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 5: Line 5:
#Location of fabrication
#Location of fabrication
#Fabrication team modification - assign someone else to fabricate
#Fabrication team modification - assign someone else to fabricate
#[https://docs.google.com/document/d/1YB34qGiFixFznUQHpP93Cp6M4ZFQu273CaBRakl6dNE/edit Fabricability checklist]  
#[[Fabricability Checklist]]
#Review of materials sourcing
#Review of materials sourcing
#Review of design after fabrication is considered
#Review of design after fabrication is considered

Revision as of 03:04, 9 August 2013

This is a review of both the fabrication strategy and other elements:

  1. Design for Tolerancing Review
  2. Tool choice - is the proposed tool choice effective, or could other tools speed up fabrication?
  3. Location of fabrication
  4. Fabrication team modification - assign someone else to fabricate
  5. Fabricability Checklist
  6. Review of materials sourcing
  7. Review of design after fabrication is considered