2014 Infrastructure: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 9: | Line 9: | ||
:#Accommodate porch/patio for HabLab | :#Accommodate porch/patio for HabLab | ||
'''2. Foundation Plan for Electronics Workshop''' | '''2. Foundation Plan for Electronics Workshop''' | ||
# | :#Including access to other parts of facility: main road, Main Street, connection to Old Workshop, Old Greenhouse | ||
:#Footprint is 48x48' for the main building (9 bays of 16'x16') | |||
# | :#Leanto on North Side - heavy equipment storage - 3 bays of 16'x16' | ||
#: | :#Footprint on South Side - 3 bays of 16x16'year-round solar roof greenhouse with front brick stem wall (4-6' high) and only top glazed, 4' sunk for thermal performance, and allowing tractor access through side door, sump pump for drainage | ||
=General Plan= | =General Plan= |
Revision as of 13:15, 10 March 2014
Requirements and Priorities
Landscape Architecture Needs and Requirements
1. Access Road to HabLab
- Includes drainage tubes, 2 - 12' long
- Parking lot before 2nd creek
- Ability to turn around in front of HabLab
- Accommodate porch/patio for HabLab
2. Foundation Plan for Electronics Workshop
- Including access to other parts of facility: main road, Main Street, connection to Old Workshop, Old Greenhouse
- Footprint is 48x48' for the main building (9 bays of 16'x16')
- Leanto on North Side - heavy equipment storage - 3 bays of 16'x16'
- Footprint on South Side - 3 bays of 16x16'year-round solar roof greenhouse with front brick stem wall (4-6' high) and only top glazed, 4' sunk for thermal performance, and allowing tractor access through side door, sump pump for drainage
General Plan
Hablab