Line 77: | Line 77: | ||
Execution Gantt - [https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0AkNG-lv1ELQvdDRFN3RXdjI1RDNkRjYyUjk2NUJJUnc&usp=sharing#gid=0] | Execution Gantt - [https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0AkNG-lv1ELQvdDRFN3RXdjI1RDNkRjYyUjk2NUJJUnc&usp=sharing#gid=0] | ||
<html><img src="https://docs.google.com/drawings/d/ | =Site Concept Execution Plan= | ||
<html><img src="https://docs.google.com/drawings/d/172DNpuCUHyqfiSat3qsB_cyrJRKTlhSRjkvWBMJdyDM/pub?w=900&h=911"></html> | |||
[https://docs.google.com/a/opensourceecology.org/drawings/d/172DNpuCUHyqfiSat3qsB_cyrJRKTlhSRjkvWBMJdyDM/edit edit] | |||
==Site Concept Execution== | |||
<html></html> | |||
[ | [ edit] | ||
<html><img src="https://docs.google.com/drawings/d/1NIIMCF8B9b-1-Z0bJMbHCPRYTx-tXMVCZm5Ytg2snsY/pub?w=900&h=1023"></html> | |||
[https://docs.google.com/a/opensourceecology.org/drawings/d/1NIIMCF8B9b-1-Z0bJMbHCPRYTx-tXMVCZm5Ytg2snsY/edit edit] | |||
=Hablab= | =Hablab= | ||
<html><img src="https://docs.google.com/drawings/d/1BRLg2lGmxBnsFX082ivs8e-m9sWDAdGWtJdDmfYSgQg/pub?w=500&h=720"></html> | <html><img src="https://docs.google.com/drawings/d/1BRLg2lGmxBnsFX082ivs8e-m9sWDAdGWtJdDmfYSgQg/pub?w=500&h=720"></html> |
Revision as of 22:01, 14 May 2014
Requirements and Priorities
Current Priorities
- May 3-15 - Design of Modular Summer Camp; wastewater installation mid May
- May 16-30 - Design of Modular Workshop.
- June 2-3 - 36 person swarm on Modular Summer Camp - 2 day build - Morning Intro. Afternoon: module instructionals testing.
- June 5-6 -
List
Landscape Architecture Needs and Requirements
1. Access Road to HabLab
- Includes drainage tubes, 2 - 12' long
- Parking lot before 2nd creek
- Ability to turn around in front of HabLab
- Accommodate porch/patio for HabLab
2. Foundation Plan for Electronics Workshop
- Including access to other parts of facility: main road, Main Street, connection to Old Workshop, Old Greenhouse
- Footprint is 48x48' for the main building (9 bays of 16'x16')
- Leanto on North Side - heavy equipment storage - 3 bays of 16'x16'
- Footprint on South Side - 3 bays of 16x16'year-round solar roof greenhouse with front brick stem wall (4-6' high) and only top glazed, 4' sunk for thermal performance, and allowing tractor access through side door, sump pump for drainage
3. Swimming Pool - grading + landscaping
- Design of pool, deck, chair area, landscaping around it
- Water and electric connections
4. Summer Camp Area
- Select location, design floor plan + structure
- Design a post-and-beam platform
- Water + electrical connection
5. Microhouse Additions
- Grade for modules 2-6, otherwise, use LifeTrac for 2-3
HabLab
HabLab Cleaning
See [1]
Bunk Beds
See Bunk Bed - includes Sketchup.
Summer Camp
Files
File:Summer camp gathering space 2014.skp
File:Summer camp gathering space2013.skp
File:Summer camp gathering space version 8.skp
General Plan
Site Concept Plan
Execution Gantt - [2]
Site Concept Execution Plan
Site Concept Execution
[ edit]
Hablab
Spring Break Plan
Work Links
- Electronics Workshop
- Workshop Organization
- Hab Lab Maintenance - [3]
- Household shopping list by Anthony - [4]
- Prep for April Workshops - [5]
- MH Addition requirements - [6]
- Workshop food program - [7]
- April 3 Week Plan - [8]
- April Workshops planning - [9]
- FeF Infrastructure Schedule for Interns
- Tasks Checklist for June 1, 2014 - execution Gantt - [10]
- FeF Infrastructure Improvements
- Infrastructure Shopping List
- Summer of 2012 water and internet line trenching