=Review Question Media=
=Review Question Media=
==Question 1==
==Question 1==
Should the first floor bond beam go around the entire perimeter of the house?
Should the first floor bond beam go around the entire perimeter of the house? Note that the bond beam is split between 2 house levels. Should it go all around the house on top of level 1?


[[File:BondBeam.jpg|500px]]
[[File:BondBeam.jpg|500px]]

Revision as of 17:05, 19 August 2014

MicroHouse Review Response Form


[ See Responses]

Review Request Document


edit this document

Review Question Media

Question 1

Should the first floor bond beam go around the entire perimeter of the house? Note that the bond beam is split between 2 house levels. Should it go all around the house on top of level 1?

Error creating thumbnail: File missing

Question 2

Is the mounting of rafters to the upper and lower mid truss strong enough?

Error creating thumbnail: File missing
Error creating thumbnail: File missing

Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?

Error creating thumbnail: File missing

Question 3

In what order should the flashing, tar paper, and corrugated roofing be installed?

Error creating thumbnail: File missing