==Question 1== | ==Question 1== | ||
Should the first floor bond beam go around the entire perimeter of the house? | Should the first floor bond beam go around the entire perimeter of the house? Note that the bond beam is split between 2 house levels. Should it go all around the house on top of level 1? | ||
[[File:BondBeam.jpg|500px]] | [[File:BondBeam.jpg|500px]] |
Revision as of 17:05, 19 August 2014
MicroHouse Review Response Form
[ See Responses]
Review Request Document
Review Question Media
Question 1
Should the first floor bond beam go around the entire perimeter of the house? Note that the bond beam is split between 2 house levels. Should it go all around the house on top of level 1?
Error creating thumbnail: File missing
Question 2
Is the mounting of rafters to the upper and lower mid truss strong enough?
Error creating thumbnail: File missing
Error creating thumbnail: File missing
Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?
Error creating thumbnail: File missing
Question 3
In what order should the flashing, tar paper, and corrugated roofing be installed?