==Question 2== | ==Question 2== | ||
Is the mounting of rafters to the upper and lower mid truss strong enough? Currently, there is a bird's mouth connection, but the upper end of the rafter is connected only at the bird's mouth. Should the upper end of the rafter be connected at | Is the mounting of rafters to the upper and lower mid truss strong enough? Currently, there is a bird's mouth connection, but the upper end of the rafter is connected only at the bird's mouth. Should the upper end of the rafter be connected at its whole face? | ||
[[File:MidTruss1.jpg|500px]] | [[File:MidTruss1.jpg|500px]] |
Revision as of 17:08, 19 August 2014
MicroHouse Review Response Form
[ See Responses]
Review Request Document
Review Question Media
Question 1
Should the first floor bond beam go around the entire perimeter of the house? Note that the bond beam is split between 2 house levels. Should it go all around the house on top of level 1?
Error creating thumbnail: File missing
Question 2
Is the mounting of rafters to the upper and lower mid truss strong enough? Currently, there is a bird's mouth connection, but the upper end of the rafter is connected only at the bird's mouth. Should the upper end of the rafter be connected at its whole face?
Error creating thumbnail: File missing
Error creating thumbnail: File missing
Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?
Error creating thumbnail: File missing
Question 3
In what order should the flashing, tar paper, and corrugated roofing be installed?