Jose Antonio log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 108: | Line 108: | ||
* Assembling a structure to cover the microhouse. | * Assembling a structure to cover the microhouse. | ||
* Making work the pool pump. | * Making work the pool pump. | ||
=Microhouse Workshop= | =Microhouse Workshop= | ||
==2014-08-08/12== | |||
==2014-08-08/ | |||
* Carpintery: building modules. | * Carpintery: building modules. | ||
* Pressing bricks. | * Pressing bricks. | ||
* Laying bricks. | |||
=Microhouse 3 workshop preparation II= | =Microhouse 3 workshop preparation II= |
Revision as of 10:23, 7 September 2014
Please post most recent entry on top
2014-09-04 - Departure
2014-09-03
* CEB Press firmware: - Minor changes in the code. - Successful test of the new firmware on the CEB Press v6 test machine. - Configured the Octoprint at Facto eFarm in the RaspbeeryPi at FactoreFarm. - The Raspberry Pi is now connecting to the "wireless" network through the wireless interface.
2014-09-02
* https://github.com/jaqm/Open-CEB-Press * New CEB Press fimrware changelog: Changelog: - Removed the auto-calibration from test-mode. - Reimplemented the test mode. - The calibration is not being reseted in manual mode. - The shaker stops the machine completely and updates the timers properly to continue the cycle with no changes in the behaviour. A delay could happen depending on how long the solenoids take to actually start moving the cylinders. - in test mode, the timed mode buttons (down and left buttons) are disabled until the cylinders have been calibrated at least for the left movement and the down movement. this is already happening in auto-mode when it goes into the failsafe stage or using the cylinder-bounce buttons [0] on test mode. - auto-mode: goes into the failsafe stage if the solenoids haven't being half-calibrated[1], if the solenoids have been already at least half-calibrated, it moves the drawer all the way right and goes directly to the close_chamber_stage to start pressing.
[0] cylinder-bounce buttons: right and up buttons on test mode. [1] Solenoids Half-calibrated: The solenoids are considered half-calibrated if we have the complete travel time for the left and down movement.
2014-09-01 Monday
* Troubleshooting the power-cubes using the Power_Cube_Failure_Modes_and_Troubleshooting and Power_Cube_Troubleshooting_Instructions. * New test on the CEB Press tests machine.
2014-08-31
* Simplifying the new CEB Press firmware. It's now ready for a new test. Improving the documentation within the code.
2014-08-30
* Fixing a problem in the controller testing board. The power cube in the CEB Press test machine is not working.
2014-08-29
* Assemblying the power cube v7 and taking pictures. * Repairing the CEB Press test machine solenoids. * Running the CEB Press, first day testing the new code on a real machine. * Writing the new CEB Press firmware.
2014-08-28
* Set up the CEB Press test machine. The solenoids are licking. * Group meeting.
2014-08-27
* Moving lumber to a better place. * Helping in the Power Cube v7 documentation. * Preparing the CEB Press test controller board.
2014-08-26
* Making work the 3D Printer. * Studying the steppers motors and stepper drivers used in the torch table. * Set up Infinoted on the Raspberry Pi that is running on the Wireless network at Factor eFarm.
2014-08-25 Monday
* Assemblying the CEB Press testing machine. * Assemblying the Power Cube in progress.
2014-08-24
* Fixing the brick press. The teensy and the fuse are broken. * Order a new Teensy for the Brick Press. * I finally publish the worklog.
2014-08-23
* Fixing the brick press.
2014-08-22
* Rainy day. * Fixed the test controller board. There was another pin that wasn't working. * Improving and fixing a bug in the new brick press code. * Fixing the brick press. * Covering the microhouse to protect it against rain.
2014-08-21
* Moving some boards to the old workshop. * Filtering and uploading pictures to trovebox fo the powercube documentation. * Found a Raspberry Pi. Set it up and now it's working on the "wireless" network. * Fixing the Brick Press. We didn't finished so we will tray again the next day if's possible.
2014-08-20
* Cutting aluminum. * Fixing the 3D-Printer, started to print little pieces for its self-improvement.
2014-08-19
* Uploading the pictures I took yesterday. * Searching contact info of similar organizations to OSE to improve social networking. * Replacing the saw of the bendsaw.
2014-08-18 Monday
* Tuning and solving bugs on the new CEB Press firmware. * Cutting steel tubes. * Cutting aluminum. * Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process. * Taking down a dom.
2014-08-17
* Melting aluminum. * First test of the new firmware on the CEB Press. * Adding new features and solving bugs on the new CEB Press firmware.
2014-08-16
* Group meeting.
2014-08-15
* Assembling a structure to cover the microhouse. * Making work the pool pump.
Microhouse Workshop
2014-08-08/12
* Carpintery: building modules. * Pressing bricks. * Laying bricks.
Microhouse 3 workshop preparation II
2014-08-04/07
* Mounting doms. * Cutting, pressing, drilling bars for the doms. * Mounting the rollers for the Brick Pressing line. * Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise! * Cleaning/organizing the buckets at the workshop. * Moving pallets and plywood to cut. * Moving soil for the brick press.
Velocar Workshop
2014-08-01/03
* Helping to 3D print parts for the battery of the Velocar during the whole day and part of the evening. * Taking pictures of the Velocar workshop. * Built a picnic table. * Baked some bread.
Microhouse 3 workshop preparation I
2014-07-22/31
* CEB Press: - Seeting up the testing CEB Press. - Pressing some bricks in the production Brick press. - CEB Press firmware: - going deep more into details of the auto-mode algorithm. - CEB Press firmware: - Review high pressure sensor flag support. - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence. - Cleaning and reviewing the code for the CEB Press. - Decide to fork and rewrite the current firmware development for the CEB Press. Git repository: https://github.com/jaqm/Open-CEB-Press * Swimming Pool: - Fixing the licks of the pool. * Microhouse 3 workshop preparation: - Cutting wood and wires. - Helping to move rebar. - Moving soil. - Handling and measuring rebar. - Bending rebar. - Some welding practice. - Publicity team. - Handling steel bars.
2014-07-21 Monday
- Brick press team. Moving the head of the machine. - Grinding and welding during the whole afternoon.
2014-07-19
- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. - 14:30-16:30: Coding the CEB Press microcontroller. - 16:30-17:30: Helping to take out some sand. - 17:30-20:00: Simplifying and fixing the Aidan's firmware of the CEB Press microcontroller.
2014-07-18
- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press. - 14:30-17:30: Reviewing with Aidan the code of the CEB Press microcontroller. - 17:30-18:00: First visit to the Workshop. - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.
2014-07-17
- 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github. - 10:00: Teamwork to redesign the OSE documentation system. - 13:00: Video record to show the progress on documentation system. - 13:30: Lunch. - 14:30: Back to work. Made a power converter EU -> US. - 15:30: Continue with the redesign of the documentation and development system. - 19:20: - Adopting Trello for the DMAIC team. - Analyzing the existing documentation platform. - Setting up a infinoted test service, installing the gobby client, show it to the team.
2014-07-16 - Arrival
- 19:00: Arrival to MCI airport. - 21:00: Arrival to Factor eFarm. - 23:00: Sleep