MicroHouse 4 Utilities: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 4: Line 4:
*Documentation of all line paths and burial depths
*Documentation of all line paths and burial depths
*Direct connection from street breaker panel to MicroHouse
*Direct connection from street breaker panel to MicroHouse
*Use 0000 aluminum cable for power
*Electric power taken from panel on workshop via 0000 aluminum cable
*Attend to crossing points of internet, and attend to location of deeper water lines
*Attend to crossing points of internet, and attend to location of deeper water lines
*1" poly pipe for water
*1" poly pipe for water

Revision as of 02:18, 28 September 2014

Test-Driven Requirements

  • Water, septic tank, outdoor water hydrant, external 200A breaker and connection point for downstream 200A circuit, internet line
  • Documentation of all line paths and burial depths
  • Direct connection from street breaker panel to MicroHouse
  • Electric power taken from panel on workshop via 0000 aluminum cable
  • Attend to crossing points of internet, and attend to location of deeper water lines
  • 1" poly pipe for water
  • Power cable depth of 18"
  • Water line depth of 36"
  • Internet line depth of 18"
  • Water teed into Hablab, and teed off for MicroHouse 3
  • Underground water fittings are buried directly using corrosion-free fittings
  • Leave provision for further extension of power grid from MicroHouse 3