D3D Inventory: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
=Visual Inventory Sheets= | |||
[[Image:visinvent3e.jpg]] | |||
[https://drive.google.com/a/opensourceecology.org/folderview?id=0ByRPBiXEVh2hWGNzTjNWNWdLbHM&usp=sharing_eid&ts=56f1e3ca Source files in GIMP/Illustrator]: | |||
=Unpacking= | =Unpacking= | ||
It took 10 hours to unpack 12 [[Folgertech Kit]]s: | It took 10 hours to unpack 12 [[Folgertech Kit]]s: |
Revision as of 00:35, 23 March 2016
Visual Inventory Sheets
Source files in GIMP/Illustrator:
Unpacking
It took 10 hours to unpack 12 Folgertech Kits:
- Separate bolts by size
- Separate every part by one of 10 Modules as at Prusa i3 Build Optimization
Further Prep
- Put set screws into L brackets (24 set screws per machine)
- Separate aluminum beams and unwrap, then tape together into a bunch
- Take bags off all aluminum bushing blocks
- Put on jumpers onto controller boards
- Put on stepper drivers onto controllers
- Bend up the transistors on stepper drivers
- Take backing off all plexiglas
- Wiring bundle - separate wires
- One pair of 22 ga thin wires goes to extruder
- Long piece of 16 ga wires goes to heated bed box
- 2 pairs of 7" 16 ga wire go to power supply
- Female end of power plug is cut
- Strip 2" off power plug end, strip off 2 cm off individual wires
Final Prep
- Upload control code to controller
- Create Live Linux USBs
- Prepare Inventory Cheat Sheets for workshop
- Solder the height probe diode and tin wire ends
- Prepare aluminum plates