PV Production Line: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 7: Line 7:
*Framer - $80k
*Framer - $80k
*Foil cutter - $20k
*Foil cutter - $20k
 
==Pakistan==
*$200k for a 10MW system? - [https://www.zorays.com/solar-investment-opportunity/]
=Links=
=Links=
*China had 7 cent/W lower labor cost than US in 2012 - [http://news.mit.edu/2013/solar-cell-manufacturing-costs-0905]
*China had 7 cent/W lower labor cost than US in 2012 - [http://news.mit.edu/2013/solar-cell-manufacturing-costs-0905]

Revision as of 18:03, 14 March 2018

Costs

  • 100MW production line quotes - [[1]]
  • Stringer - $40k
  • Laminator - $60k
  • Layup - $60k
  • Flasher - $40k
  • Framer - $80k
  • Foil cutter - $20k

Pakistan

  • $200k for a 10MW system? - [2]

Links

  • China had 7 cent/W lower labor cost than US in 2012 - [3]