=Tentative Schedule - March 2018=
*June 1-3 - Aquaponic Greenhouse. Outcomes: full documentation of panel build. Construction Set in Sweet Home for entertainment. FreeCAD Workbench for the technical design. Modeling Kit.
*June 4-6 - Off-Grid PV Workshop. Goal: a model kit. With every workshop increasing the level of open source. Such as German charge controller.
*July (August?) 13-15 - Aquaponics Workshop 2 - pending mastery of June 1-3
*Nov 2-7 - Utah Build. Critical requirements: 3 month cutoff at Aug 1 for Foundation and Bricks. Foundation to spec, and 6000 bricks pressed. Floor level laser shot, and filled with sand + PEX if want hydronics. (152 feet of wall - 11 wall sections = 108 feet of wall. 5400 4x6x12 block or 864 cubic feet. See [[Bricks in a Wall]].
=Tentative Schedule - November 2017=
=Tentative Schedule - November 2017=
*Feb 15 - CNC Torch Table Build
*Feb 15 - CNC Torch Table Build

Revision as of 15:24, 20 March 2018

Tentative Schedule - March 2018

  • June 1-3 - Aquaponic Greenhouse. Outcomes: full documentation of panel build. Construction Set in Sweet Home for entertainment. FreeCAD Workbench for the technical design. Modeling Kit.
  • June 4-6 - Off-Grid PV Workshop. Goal: a model kit. With every workshop increasing the level of open source. Such as German charge controller.
  • July (August?) 13-15 - Aquaponics Workshop 2 - pending mastery of June 1-3


  • Nov 2-7 - Utah Build. Critical requirements: 3 month cutoff at Aug 1 for Foundation and Bricks. Foundation to spec, and 6000 bricks pressed. Floor level laser shot, and filled with sand + PEX if want hydronics. (152 feet of wall - 11 wall sections = 108 feet of wall. 5400 4x6x12 block or 864 cubic feet. See Bricks in a Wall.

Tentative Schedule - November 2017

  • Feb 15 - CNC Torch Table Build
  • March 1 - 3D Printer Build, Saudi Arabia?
  • March 15 - CEB Press + Soil Conditioner + Tractor Build, Costa Rica
  • April 1 - 3D Printer Build
  • April 15 - 64 hp tractor build
  • May - Aquaponic Greenhouse Build
  • June - CEB Press build
  • July - MicroTractor Build
  • August - House Build