*June 1-3 - Aquaponic Greenhouse. Outcomes: full documentation of panel build. Construction Set in Sweet Home for entertainment. FreeCAD Workbench for the technical design. Modeling Kit. | *June 1-3 - Aquaponic Greenhouse. Outcomes: full documentation of panel build. Construction Set in Sweet Home for entertainment. FreeCAD Workbench for the technical design. Modeling Kit. | ||
*June 4-6 - Off-Grid PV Workshop. Goal: a model kit. With every workshop increasing the level of open source. Such as German charge controller. | *June 4-6 - Off-Grid PV Workshop. Goal: a model kit. With every workshop increasing the level of open source. Such as German charge controller. Needs [[Open Source Superefficient Refrigerator Conversion]]. | ||
*July (August?) 13-15 - Aquaponics Workshop 2 - pending mastery of June 1-3 | *July (August?) 13-15 - Aquaponics Workshop 2 - pending mastery of June 1-3 | ||
*Nov 2-7 - Utah Build. Critical requirements: 3 month cutoff at Aug 1 for Foundation and Bricks. Foundation to spec, and 6000 bricks pressed. OSE consults with Client's Foundation Contractor. OSE comes for a training visit on CEBs, and foundation inspection + 360 degree embed. Floor level laser shot, and filled with sand + PEX if want hydronics. (152 feet of wall - 11 wall sections = 108 feet of wall. 5400 4x6x12 block or 864 cubic feet. See [[Bricks in a Wall]]. Partial bricks must be pressed. Client pulls permits, OSE sends necessary documents. OSE prepares Builder Pack. Creates a Publication, "How to Organize an Extreme Build of the Seed Eco-Home." Further provides a 3D tour. OSE provides thermal imagining of final house with [[Open Source Thermal Camera]] | |||
=Tentative Schedule - November 2017= | =Tentative Schedule - November 2017= | ||
*Feb 15 - CNC Torch Table Build | *Feb 15 - CNC Torch Table Build |
Revision as of 15:32, 20 March 2018
Tentative Schedule - March 2018
- June 1-3 - Aquaponic Greenhouse. Outcomes: full documentation of panel build. Construction Set in Sweet Home for entertainment. FreeCAD Workbench for the technical design. Modeling Kit.
- June 4-6 - Off-Grid PV Workshop. Goal: a model kit. With every workshop increasing the level of open source. Such as German charge controller. Needs Open Source Superefficient Refrigerator Conversion.
- July (August?) 13-15 - Aquaponics Workshop 2 - pending mastery of June 1-3
- Nov 2-7 - Utah Build. Critical requirements: 3 month cutoff at Aug 1 for Foundation and Bricks. Foundation to spec, and 6000 bricks pressed. OSE consults with Client's Foundation Contractor. OSE comes for a training visit on CEBs, and foundation inspection + 360 degree embed. Floor level laser shot, and filled with sand + PEX if want hydronics. (152 feet of wall - 11 wall sections = 108 feet of wall. 5400 4x6x12 block or 864 cubic feet. See Bricks in a Wall. Partial bricks must be pressed. Client pulls permits, OSE sends necessary documents. OSE prepares Builder Pack. Creates a Publication, "How to Organize an Extreme Build of the Seed Eco-Home." Further provides a 3D tour. OSE provides thermal imagining of final house with Open Source Thermal Camera
Tentative Schedule - November 2017
- Feb 15 - CNC Torch Table Build
- March 1 - 3D Printer Build, Saudi Arabia?
- March 15 - CEB Press + Soil Conditioner + Tractor Build, Costa Rica
- April 1 - 3D Printer Build
- April 15 - 64 hp tractor build
- May - Aquaponic Greenhouse Build
- June - CEB Press build
- July - MicroTractor Build
- August - House Build