Sara Build Certification: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 20: Line 20:
=Links=
=Links=
*Sara Kit - [https://www.facebook.com/photo.php?fbid=132708801045459&set=a.124873365162336&type=3&theater]
*Sara Kit - [https://www.facebook.com/photo.php?fbid=132708801045459&set=a.124873365162336&type=3&theater]
=Notes=
*Label the frame in the kit build, but don't label motors
*Silver sharpie for labeling during kit build. Label just cables for x, y, z cables, and x and y endstops

Revision as of 17:40, 12 November 2018

Procedure

Build - [1]

Document on your log as Your_Name Kit Build with total of 18 pictures and 14 times.

  1. Build frame. 3 detailed Finished Pictures showing the amount of epoxy used on inside bottom, inside sides, and inside top. Time.
  2. Build Y Left Axis twice. Finished Picture from the side opposite of the motor. Time.
  3. Build Y Right Axis twice. Finished Picture from the opposite side of the motor. Time.
  4. Build X axis. Finished picture from motor side. Time
  5. Build extruder assembly. Finished picture. Time.
  6. Build heated bed (PEI addition + twist white wire around red. Finished picture from both sides. Time.
  7. Build control panel. Finished picture from both sides. Time.
  8. Mount Y axes and Z axes. Finished Picture. Time.
  9. Mount the X axis. Finished picture. Time.
  10. Mount heated bed. Finished picture. Time.
  11. Mount extruder. Finished picture. Time.
  12. Do cable chain and all wire routing and tidying. Label the plugs. Finished picture. Time.
  13. Mount spool holder and filament. Finished Picture. Time.
  14. Upload .ini file for this printer to your log. Insert SD card with test cube. Print sample Test Cube at normal speed. Picture. Time.

Links

Notes

  • Label the frame in the kit build, but don't label motors
  • Silver sharpie for labeling during kit build. Label just cables for x, y, z cables, and x and y endstops