Universal Axis Applications: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
*API - | *API - | ||
*1000s of times every day | *1000s of times every day | ||
*6 month time between | *6 month time between maintenance | ||
=OSE Tech= | =OSE Tech= | ||
Line 14: | Line 14: | ||
*Weight and geometry of effector. Requirement. Cost and performance spec. $800 for just the gantry part. | *Weight and geometry of effector. Requirement. Cost and performance spec. $800 for just the gantry part. | ||
*Phase 1 - CAD model + BOM - specify the full BOM | *Phase 1 - CAD model + BOM - specify the full BOM | ||
*Phase 2 - Visit for production. Show up and build it. | *Phase 2 - Visit for production build in Shenzhen. Show up and build it - in one day. | ||
=Design Requirements= | =Design Requirements= | ||
* | * |
Revision as of 20:50, 10 January 2019
- Has workshop in Shenzhen - EDM + cnc
- 120 cm longest axis
- API -
- 1000s of times every day
- 6 month time between maintenance
OSE Tech
- 3D Printer Part library - D3D_Part_Library#D3D_16.22
- 3D Printer Manual - 3D_Printer_Manual#Introduction_and_Parts
- Circuit Mill - D3D_CNC_Circuit_Mill
Design
- Open source, transparent design. Someone on board to make good design choices.
- Weight and geometry of effector. Requirement. Cost and performance spec. $800 for just the gantry part.
- Phase 1 - CAD model + BOM - specify the full BOM
- Phase 2 - Visit for production build in Shenzhen. Show up and build it - in one day.