Resource Development Strategy: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:


http://piratepad.net/Egu6wQCWS7
http://piratepad.net/Egu6wQCWS7
this goes on wiki at Resource Development Strategy
=Introduction=
Here is th e near-term and 2 year plan for resource development. [[Julia Valentine]] is heading the resource development effort:
*[[Blog post]] - How I got involved, what I'm doing now, goals for the next 2 years, starting with April 26
*[[Julia Introductory Video]]
See overview of GVCS strategic development - [[GVCS_50/2/2]]
=Strategy=
*[[Adrian Hong]] is serving as OSE business/nonprofit strategy advisor
*First item is to prepare the Donor Relations Package (DRP)
*Adrian will facilitate connections within TED community
*Aligning the opensourceecology.org with DRP
**Adrian will assist on the message
*Involve Isaiah with further media development
*Secure office equipment for Missouri and California branches of OSE
*?Donor visits to Factor e Farm
**?Requires preparation of infrastructure
**?Mobile Microhouse?
*CiviCRM - install it immediately; front and back end
*Crowdmap for viewing developers and extracting value into CiviCRM- Dan, Netherlands, Poland, Brazil, Sebastopol, etc.
*Develop a wide array of options with Adrian:
**True Fans - when Civi up, we'll put all in there
**Individual donors
**Website donations
**Microdonations like Flattr
**Grants
**Awards/Fellowships
**TED community
**Dedicated Project Sponsorship - with your name attached for posterity
**Kickstarter
=Donor Relations Strategy=
*Donor Relations Package
**Folder with a few Simple Trifold
**Website completed and simplified
**Intro from Director
**One page overview of mission-like positioning
**Budget Overall, and for each of the 50 tools, tool by tool; keep adding to [[Proposal 2012]]
***Have individuals sponsor on a tool-by-tool basis
**Status report - [[GVCS Tools Status]] but done properly
*Produce a full-fledged Documentary about half-way through the project
**Possibly Ben Zolno, Sebastopol, or Sundance people from TED; fund this properly
=Timeline=
*April 26 - first complete draft of Resource Development Package
**Overall package
**Tool by tool package (47 packages)
*April 12 -  Civi installed, and first tutorial for Marcin, Julia, Elifarley
=Immediate Action Items=
*Introduce Julia and Adrian to set up conference call around Friday April 1
*Work on securing office eqiupment
*Meeting with Judith Katz April 11 on database structure
*Follow  up on Civi with Elifarley


Here we're
Here we're

Revision as of 21:58, 29 March 2011

Introduction

http://piratepad.net/Egu6wQCWS7

this goes on wiki at Resource Development Strategy

Introduction

Here is th e near-term and 2 year plan for resource development. Julia Valentine is heading the resource development effort:

See overview of GVCS strategic development - GVCS_50/2/2

Strategy

  • Adrian Hong is serving as OSE business/nonprofit strategy advisor
  • First item is to prepare the Donor Relations Package (DRP)
  • Adrian will facilitate connections within TED community
  • Aligning the opensourceecology.org with DRP
    • Adrian will assist on the message
  • Involve Isaiah with further media development
  • Secure office equipment for Missouri and California branches of OSE
  • ?Donor visits to Factor e Farm
    • ?Requires preparation of infrastructure
    • ?Mobile Microhouse?
  • CiviCRM - install it immediately; front and back end
  • Crowdmap for viewing developers and extracting value into CiviCRM- Dan, Netherlands, Poland, Brazil, Sebastopol, etc.
  • Develop a wide array of options with Adrian:
    • True Fans - when Civi up, we'll put all in there
    • Individual donors
    • Website donations
    • Microdonations like Flattr
    • Grants
    • Awards/Fellowships
    • TED community
    • Dedicated Project Sponsorship - with your name attached for posterity
    • Kickstarter

Donor Relations Strategy

  • Donor Relations Package
    • Folder with a few Simple Trifold
    • Website completed and simplified
    • Intro from Director
    • One page overview of mission-like positioning
    • Budget Overall, and for each of the 50 tools, tool by tool; keep adding to Proposal 2012
      • Have individuals sponsor on a tool-by-tool basis
    • Status report - GVCS Tools Status but done properly
  • Produce a full-fledged Documentary about half-way through the project
    • Possibly Ben Zolno, Sebastopol, or Sundance people from TED; fund this properly

Timeline

  • April 26 - first complete draft of Resource Development Package
    • Overall package
    • Tool by tool package (47 packages)
  • April 12 - Civi installed, and first tutorial for Marcin, Julia, Elifarley

Immediate Action Items

  • Introduce Julia and Adrian to set up conference call around Friday April 1
  • Work on securing office eqiupment
  • Meeting with Judith Katz April 11 on database structure
  • Follow up on Civi with Elifarley


Here we're