CEB Press/Manufacturing Instructions/Soil grate: Difference between revisions
Jump to navigation
Jump to search
(Created page with " == Tools Required == == Materials Required == == Diagrams == == Fabrication Steps ==") |
|||
Line 5: | Line 5: | ||
== Materials Required == | == Materials Required == | ||
*1/4”x2”x2” angle, 6' (2) | |||
*1/4”x2”x2” angle, 3' (2) | |||
*1/4”x2” bar, 71.5” | |||
*3/8” rebar, 105' | |||
== Diagrams == | == Diagrams == |
Revision as of 03:56, 21 April 2011
Tools Required
Materials Required
- 1/4”x2”x2” angle, 6' (2)
- 1/4”x2”x2” angle, 3' (2)
- 1/4”x2” bar, 71.5”
- 3/8” rebar, 105'