David Lemmer: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
*[[Extreme_Enterprise_Event_Design#Pre-Preparation]] | *[[Extreme_Enterprise_Event_Design#Pre-Preparation]] | ||
*Start with Definition of Done | *Start with Definition of Done | ||
* | *Metrics - how do you measure if the process went well. | ||
**Number of modules successfully produced | |||
**Metric - number of people, and proper teams that showed up. |
Revision as of 22:26, 14 July 2020
- AFIT - Air Force Institute of Technology . Ohio.
- Systems Engineering Masters - model-based systems engineering. Systems engineering - before it used to be document based.
- Extreme_Enterprise_Event_Design#Pre-Preparation
- Start with Definition of Done
- Metrics - how do you measure if the process went well.
- Number of modules successfully produced
- Metric - number of people, and proper teams that showed up.