Lesego Log: Difference between revisions
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
*Spiral system for washing chrome. Did a small plant. Electrical motors. Cheaper to run on electrical. | *Spiral system for washing chrome. Did a small plant. Electrical motors. Cheaper to run on electrical. | ||
*'I'm a metallurgist'. | *'I'm a metallurgist'. | ||
*Production and smelting facility, and creating the opportunity for others. | *Production and smelting facility, and creating the opportunity for others. Interested in steel. | ||
=Fri Jul 24, 2020= | =Fri Jul 24, 2020= |
Revision as of 18:21, 13 August 2020
Thu Aug 13, 2020
- Sees interest in heavy machines
- Got a little bit into 3D printing
- 2 months backlog from COVID, now lower risk. Catching up at work now.
- After 4-5 months will review if can spend more than 20 hours/week
- Wants a chapter.
- Engineers, mechanical, structural, electrical. Has a permanent team of lead engineers.
- Metallurgical, process engineer - Lesego
- Junior engineers, not permanent.
- Mining. Process plant - they don't do greenfield (from scratch). Goes into operations that exist, or expansion. Feasibility studies.
- Spiral system for washing chrome. Did a small plant. Electrical motors. Cheaper to run on electrical.
- 'I'm a metallurgist'.
- Production and smelting facility, and creating the opportunity for others. Interested in steel.