Seed Home 2 Product Strategy: Difference between revisions
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
*Coffee table book. | *Coffee table book. | ||
*House | *House | ||
*3D Printer | *Large 3D Printer | ||
*High T 3D Printer | |||
*Inverter | |||
*3D Printing enterprise for producing trim and other materials | *3D Printing enterprise for producing trim and other materials | ||
*Tractor and Microtractor | *Tractor and Microtractor | ||
Line 18: | Line 20: | ||
*Helical Pier Manufacturing | *Helical Pier Manufacturing | ||
*Helical Pier Driver | *Helical Pier Driver | ||
*Nickel-Iron battery | |||
<html> <img src="https://docs.google.com/drawings/d/e/2PACX-1vSoeYdNXP1hWTlIYYsiT0lZ-9xnKsV-od5DSWCITh6B6hqLhvdEGABW84BGCTT4C7iMjpaM2lh8xLVt/pub?w=701&h=394"> </html> | <html> <img src="https://docs.google.com/drawings/d/e/2PACX-1vSoeYdNXP1hWTlIYYsiT0lZ-9xnKsV-od5DSWCITh6B6hqLhvdEGABW84BGCTT4C7iMjpaM2lh8xLVt/pub?w=701&h=394"> </html> |
Revision as of 17:45, 26 August 2020
How to Define the Product
What does the customer receive? How do involve entrepreneurs in our customer base?
- For stakeholdership, we involve entrepreneurs who want a house - to guarantee proper execution incentive. Risk: good fit, so all customers are not freeriding. Solution: customers are vetted and onboarded.
- Training Fee is separate from House Facilitation Fee.
- Customer pays for materials
- Materials schedule is defined as a shipment schedule for partial completion, as one goes along. Multiple shipments mean additional shipping cost ($130 per 34 mile delivery to FeF as example from Menards (300 stores))
Products
- House Manual - solving for housing.
- Coffee table book.
- House
- Large 3D Printer
- High T 3D Printer
- Inverter
- 3D Printing enterprise for producing trim and other materials
- Tractor and Microtractor
- Mowing and baling attachments
- Helical Pier Manufacturing
- Helical Pier Driver
- Nickel-Iron battery
OSE Service
- We need to gurantee that our entrepreneurs stick around.
- Immersion training needs to assure technical skill:
- 7 day basic training - foundation, floor, wall, roof, interior wall, utility panel, bathroom
- 1 day foundation
- 1 day PV
- 1 day kitchen
- Monthly schedule - 2 sessions per month - 100 people each - for 5 months - for the first 1000 houses.
- First builds - people can start on modules after 3 months - the immersion period for entrepreneurs. $25k charge for entrepreneurs.
- Eeach entrepreneur gets $15k. Integration with OSE Certified Entrepreneurs - after 6 months fo
- 2 year overall delivery time
- OSE Contractors - charge them for 2 months of immersion
- OSE service - from the time of 3 months after Basic Entrepreneur Training.
- Each entrepreneur gets 10 houses for a year, 50/50 share of $15k. $75k.
- Each individual who builds benefits from OSE marketing to advertise a public Extreme Build - if the situation allows. This could allow the house to be built easily, and more finishing to be done.
Shape Options
Beautification Budget