Final Plumbing Inspection: Difference between revisions
Jump to navigation
Jump to search
(Added a Category to the Page) |
No edit summary |
||
Line 1: | Line 1: | ||
=Checklist= | |||
*https://mybuildingpermit.com/sites/default/files/documentation/Plumbing%20Final.pdf | *https://mybuildingpermit.com/sites/default/files/documentation/Plumbing%20Final.pdf | ||
=Test= | |||
*Close sewer and top vent. Fill traps of all fixtures. Flush toilet. If water does not go down in toilet, then system is air tight, test passed. [https://www.youtube.com/watch?v=d43KqUo6bTI] | |||
=Links= | =Links= |
Latest revision as of 10:12, 2 April 2022
Checklist
Test
- Close sewer and top vent. Fill traps of all fixtures. Flush toilet. If water does not go down in toilet, then system is air tight, test passed. [1]