Final Plumbing Inspection: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (Added a Category to the Page) | No edit summary | ||
| Line 1: | Line 1: | ||
| =Checklist= | |||
| *https://mybuildingpermit.com/sites/default/files/documentation/Plumbing%20Final.pdf | *https://mybuildingpermit.com/sites/default/files/documentation/Plumbing%20Final.pdf | ||
| =Test= | |||
| *Close sewer and top vent. Fill traps of all fixtures. Flush toilet. If water does not go down in toilet, then system is air tight, test passed. [https://www.youtube.com/watch?v=d43KqUo6bTI] | |||
| =Links= | =Links= | ||
Latest revision as of 10:12, 2 April 2022
Checklist
Test
- Close sewer and top vent. Fill traps of all fixtures. Flush toilet. If water does not go down in toilet, then system is air tight, test passed. [1]