*CEB block at 1 cents/block cost - [[CEB Block Cost]] - if labor is used to stack block directly in walls. Challenge: soil moving or digging, to site.
*CEB block at 1 cents/block cost - [[CEB Block Cost]] - if labor is used to stack block directly in walls. Challenge: soil moving or digging, to site.
*Max practical imported PV is 3.2 kw (320 sf) - multiplied 2x for 2 of these trailers per site. Telescoped to span between trailers - 4 trailer widths. Total of 8 trailers' worth = 25 kW of energy = 150kW hr/day. This is 2 kg/kwhr - 300 kg per day. Require  
*Max practical imported PV is 3.2 kw (320 sf) - multiplied 2x for 2 of these trailers per site. Telescoped to span between trailers - 4 trailer widths. Total of 8 trailers' worth = 25 kW of energy = 150kW hr/day. This is 2 kg/kwhr - 300 kg per day. Require, per [[Solar Concrete]] - 
*A campus has a quarry which is turned into a lake, as well as cement production, and lumber, and plastic production for free materials.
*A campus has a quarry which is turned into a lake, as well as cement production, and lumber, and plastic production for free materials.

Revision as of 23:20, 29 August 2022

  • CEB block at 1 cents/block cost - CEB Block Cost - if labor is used to stack block directly in walls. Challenge: soil moving or digging, to site.
  • Max practical imported PV is 3.2 kw (320 sf) - multiplied 2x for 2 of these trailers per site. Telescoped to span between trailers - 4 trailer widths. Total of 8 trailers' worth = 25 kW of energy = 150kW hr/day. This is 2 kg/kwhr - 300 kg per day. Require, per Solar Concrete -
  • A campus has a quarry which is turned into a lake, as well as cement production, and lumber, and plastic production for free materials.