As we fless out execution, some details change. The [[Maysville Permit]] doc shows the original submission. Here is the design iteration after ground-truthing. | |||
=Maysville Permit Doc= | =Maysville Permit Doc= | ||
House construction permit for Maysville: | House construction permit for Maysville: | ||
Line 5: | Line 8: | ||
[https://docs.google.com/presentation/d/1lYarNhSCXGjW81FjpitHZPlrUZkH9ilVuOyQV7BIJcA/edit#slide=id.g123f2be0d6c_0_3 edit] | [https://docs.google.com/presentation/d/1lYarNhSCXGjW81FjpitHZPlrUZkH9ilVuOyQV7BIJcA/edit#slide=id.g123f2be0d6c_0_3 edit] | ||
=Designg and Utilities= | =Designg and Utilities= |
Revision as of 01:16, 20 November 2022
Post-Permit Working Doc
As we fless out execution, some details change. The Maysville Permit doc shows the original submission. Here is the design iteration after ground-truthing.
Maysville Permit Doc
House construction permit for Maysville:
Designg and Utilities
- Maysville Permit - shows design concept for the public record.
- Rosebud 3 Building Book - [1]
- SEH 4 Plumbing
- SEH 4 Electrical