SH4 Future Work: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:
*Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?
*Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?
*Wiring behind fridge - simplify for countertop UC on entire West wall?
*Wiring behind fridge - simplify for countertop UC on entire West wall?
*Finish all CAD - make everything interoperable and documented. On Part Library pages with clear instructions on what is what. Requires annotation. Requires file. Collates files in multiple formats. Shows visual representation.

Revision as of 21:02, 22 January 2023

SH4 Future WorkSH4 Challenges

  • Under stair closet door - redesign for modularity
  • Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?
  • Wiring behind fridge - simplify for countertop UC on entire West wall?
  • Finish all CAD - make everything interoperable and documented. On Part Library pages with clear instructions on what is what. Requires annotation. Requires file. Collates files in multiple formats. Shows visual representation.