SH4 Future Work: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[SH4 Future Work]][[SH4 Challenges]] | [[SH4 Future Work]].[[SH4 Challenges]].[[Collaborative Design 2023]] | ||
*Under stair closet door - redesign for modularity | *Under stair closet door - redesign for modularity |
Revision as of 21:07, 22 January 2023
SH4 Future Work.SH4 Challenges.Collaborative Design 2023
- Under stair closet door - redesign for modularity
- Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?
- Wiring behind fridge - simplify for countertop UC on entire West wall?
- Finish all CAD - make everything interoperable and documented. On Part Library pages with clear instructions on what is what. Requires annotation. Requires file. Collates files in multiple formats. Shows visual representation.