Ukraine Reconstruction: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "*It's an experiment in defining a model for the deployment rate of scalable activity. *Industry standard: money + proprietary tech; expensive kit, no distributive open source,...")
 
No edit summary
Line 6: Line 6:
**Solar concrete trailer produces lime concrete foundations on gravel with solid geotextiled gravel bed for proper drainage and shallow insulated footer  
**Solar concrete trailer produces lime concrete foundations on gravel with solid geotextiled gravel bed for proper drainage and shallow insulated footer  
**Lime concrete - 315 tons per year. 315 foundations per acre at [[Farm Yields Per Acre]]
**Lime concrete - 315 tons per year. 315 foundations per acre at [[Farm Yields Per Acre]]
**Rock crusher - makes gravel, all waste is fed into it.

Revision as of 19:39, 29 August 2023

  • It's an experiment in defining a model for the deployment rate of scalable activity.
  • Industry standard: money + proprietary tech; expensive kit, no distributive open source, no swarmability becuase nobody does crowd swarming (outside of Habitat)
    • 10x lower capital cost on the fabrication of CEB presses, if done at scale. Matters at the 100 CEB level, where each produces 600/hr * 24=14,400 block per day. One house a day.
    • 10x lower cost means $500k for block presses
    • Solar trailer for rebar welding gives the trusses or solid beam top plates, doable everywhere.
    • Solar concrete trailer produces lime concrete foundations on gravel with solid geotextiled gravel bed for proper drainage and shallow insulated footer
    • Lime concrete - 315 tons per year. 315 foundations per acre at Farm Yields Per Acre
    • Rock crusher - makes gravel, all waste is fed into it.