Gravel: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 4: Line 4:
*2" minus is 3200 lb/cu meter [https://www.aqua-calc.com/page/density-table/substance/gravel-coma-and-blank-dry-blank-1-forward-slash-4-blank-to-blank-2-blank-inch]
*2" minus is 3200 lb/cu meter [https://www.aqua-calc.com/page/density-table/substance/gravel-coma-and-blank-dry-blank-1-forward-slash-4-blank-to-blank-2-blank-inch]
*100 pcf for 3" and 125 pcf for 3" minus [https://www.eng-tips.com/viewthread.cfm?qid=220397]
*100 pcf for 3" and 125 pcf for 3" minus [https://www.eng-tips.com/viewthread.cfm?qid=220397]
*3/4" unwashed is 1.3 tons per yard [https://asphaltmaterials.net/products/3-4-minus-construction-gravel]


=2021 Prices=
=2021 Prices=

Revision as of 16:02, 31 October 2023

Voids and Density

  • 40% voids typi
  • ASTM 57 is 2400 lb/yard
  • 2" minus is 3200 lb/cu meter [1]
  • 100 pcf for 3" and 125 pcf for 3" minus [2]
  • 3/4" unwashed is 1.3 tons per yard [3]

2021 Prices

  • For roads - Les Meek - 816.724.0489
  • Road Base - $14.50
  • New workshop - 1-1/4" road base - 71 tons [4] - $1375. That makes for $19.65/ton delivered. Base price of rock is $14.50
  • For 17 tons, Larry McFee was $303 ($17.82/ton) for SEH 2