(Created page with "*Observe subfloor joists. Sand or caulk any final defects. *310 shellac the bottom edges where meeded")
 
No edit summary
Line 1: Line 1:
*Observe subfloor joists. Sand or caulk any final defects.
*Observe subfloor joists. Sand or caulk any final defects.
*310 shellac the bottom edges where meeded
*310 shellac the bottom edges where needed
*45 degree shellac 515 into corners
*Right angle to subfloor
*Right angle to bottom vertical of joists.
Thus

Revision as of 20:37, 15 September 2024

  • Observe subfloor joists. Sand or caulk any final defects.
  • 310 shellac the bottom edges where needed
  • 45 degree shellac 515 into corners
  • Right angle to subfloor
  • Right angle to bottom vertical of joists.

Thus