Malicious Trespass
*Procedure for fence?
*Where fence?
*Accuracy of fence? Pin it.
*For the fence, would you put the posts entirely on your side?
*If so, where will the barbed wire be located?
*Size of main posts and interim posts? Size of corner posts such as between paddocks?
*Were you planning on a dividing fence between 2 paddocks?
*Were you planning on adding other paddocks ie additional corner posts?
*Wherearkers? 1000 and 800 feet
*How do you mark amline between?
*Did you use a transit?
*Absolutely Straight or curved, bends?
*Walk me through provedure for determining where you will clear?
Tube
Tube
*Where is it?
*Where is it?

Revision as of 21:56, 26 September 2024

Malicious Trespass

  • Procedure for fence?
  • Where fence?
  • Accuracy of fence? Pin it.
  • For the fence, would you put the posts entirely on your side?
  • If so, where will the barbed wire be located?
  • Size of main posts and interim posts? Size of corner posts such as between paddocks?
  • Were you planning on a dividing fence between 2 paddocks?
  • Were you planning on adding other paddocks ie additional corner posts?
  • Wherearkers? 1000 and 800 feet
  • How do you mark amline between?
  • Did you use a transit?
  • Absolutely Straight or curved, bends?
  • Walk me through provedure for determining where you will clear?

Tube

  • Where is it?
  • How long is it?
  • How much of it on your land?
  • How much of it is on our land?
  • Did you ask us for permission to locate it where you did?
  • Are you saying that the tube is entirely on your land?

Excavator work day 1

  • Where started, etc.

Euipment day 2-3

  • What power equipment was involved? Dozer, backhoe, tracked skid, auger, chainsaw.
  • How many machine hours on those days, any record?
  • If no - roughly for the excavator on the 3 days?
  • Roughly on the dozer?
  • Roughly on tracked skid steer?
  • What model chainsaw?
  • How long does it take you to cut through a 12" diameter tree?
  • How long does it take to cut through a 3' tree?
  • Size?
  • Model track hoe?
  • Boom upward force or lift?
  • Reach?
  • Dozer model and size?
  • Tractor pull or push?
  • What are these tracks in this aerial?
  • Draw the path of dozer on this picture?
  • How many times did it go back and forth?

Bales

  • What is the last haying date for Maysville?

Bales

  • How do

you calculate bale yield for the parcel ?.

Flynn work

  • Please take a look at Flynn receipt. Is that a true and accurate copy of receipt?
  • Is this an authentic receipt?
  • What was included?
  • Was augering post holes included?
  • Do you have other receipts, such as for the fence posts in the corner
  • What are the three elements of a receipt ? What, cost, date.

Water

  • Where is the hydrant for X Service located?
  • How many hydrants are there connected to this service?
  • How do you water the northern part of Tract?
  • How do you water southern half?
  • Point to North of Road part of Tract.

How do you water tract North of Road?

  • Can you draw a boundary around northern tract? Southern tract?
  • Are they fenced off from one another?
  • Is there a gate between?
  • How much did the events save you on water?

Cow Damages

  • How did you calculate supplemental feeding damages
  • What would it cost you to put up a temporary fence?
  • What would a temporary fence look like?
  • Cost?
  • Labor?