Apprenticeship Development Log: Difference between revisions
Jump to navigation
Jump to search
(Created page with "=Tue May 20, 2025= #Dozer rental for 20k sf building. Start BOM + design. Gravel cost - 1000 sf takes 1 truck at 4" =17.5 ton") |
No edit summary |
||
Line 1: | Line 1: | ||
=Tue May 20, 2025= | =Tue May 20, 2025= | ||
#Dozer rental for 20k sf building. Start BOM + design. Gravel cost - | #Dozer rental for 20k sf building. Start BOM + design. | ||
#Gravel cost - 30k dg = $15k | |||
#Building Cost - platform on edges with 8x16 units. See [[6_Bath_6_Shower#BOM]] for base platform |
Revision as of 18:01, 20 May 2025
Tue May 20, 2025
- Dozer rental for 20k sf building. Start BOM + design.
- Gravel cost - 30k dg = $15k
- Building Cost - platform on edges with 8x16 units. See 6_Bath_6_Shower#BOM for base platform