Instructionals To Do List: Difference between revisions
Jump to navigation
Jump to search
m (moved Insructionals To Do List to Instructionals To Do List) |
No edit summary |
||
Line 1: | Line 1: | ||
=To be taken up by [[Ian Midgley]]= | =To be taken up by [[Ian Midgley]]= | ||
#Fabrication o of sensor units for CEB press from raw components to encapsulated sensor | |||
#Fabrication steps for soil loading drawer | |||
#Edit of assembly procedure for entire frame, starting from components | |||
#Building hopper shaker assembly | |||
#Building of hopper superstructure and connection to frame | |||
#Asembly and function of cylinder ajusters: forward, side to side, and drawer adjusters | |||
#Documentation of CEB machine dimensions, piece by piece | |||
#Hydrauilics hookup and operation procedure | |||
#Brick pressing sequence explanation | |||
#Sawmill: operation procedures from existing footage | |||
#Tractor: wheel attachment procedure | |||
#Tractor: loader mounting procedure | |||
#Power Cube: overall assembly procedure starting from raw parts | |||
#Soil pulverizer: overall assembly procedure | |||
#Power Cube: wiring walkthrough | |||
#CEB press: field operating procedure from setup to bricks pressed | |||
[[Category:Instructionals]] | [[Category:Instructionals]] |
Revision as of 19:20, 25 August 2011
To be taken up by Ian Midgley
- Fabrication o of sensor units for CEB press from raw components to encapsulated sensor
- Fabrication steps for soil loading drawer
- Edit of assembly procedure for entire frame, starting from components
- Building hopper shaker assembly
- Building of hopper superstructure and connection to frame
- Asembly and function of cylinder ajusters: forward, side to side, and drawer adjusters
- Documentation of CEB machine dimensions, piece by piece
- Hydrauilics hookup and operation procedure
- Brick pressing sequence explanation
- Sawmill: operation procedures from existing footage
- Tractor: wheel attachment procedure
- Tractor: loader mounting procedure
- Power Cube: overall assembly procedure starting from raw parts
- Soil pulverizer: overall assembly procedure
- Power Cube: wiring walkthrough
- CEB press: field operating procedure from setup to bricks pressed