Category:OS2: Difference between revisions
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
The main points are to refine the design of the system and prepare all the materials for integration. | The main points are to refine the design of the system and prepare all the materials for integration. | ||
The points to develop | The points to develop prior to OS2 are: | ||
#Demonstrate a working reflector slat. This includes (including cost milestones | #Demonstrate a working reflector slat. This includes (including cost milestones for materials): | ||
##Structure for holding mirrors ($6, without mirrors) | ##Structure for holding mirrors ($6 per slat, without mirrors) | ||
##Mirror attachment strategy ($1) | ##Mirror attachment strategy ($1 per slat) | ||
##Conrol electronics, motor, feedback sensor, and control logic ($5 per slat) | ##Conrol electronics, motor, feedback sensor, and control logic ($5 per slat) | ||
#Develop an explicit design for the collector tube ($500) | |||
##Source materials | |||
#Develop valving system for collector tube feedwater entry ($150) | |||
#Develop digital fabriction of steam engine ($100) | |||
#Modernize said steam engine with electronic steam injection ($50 for valve and controls) | |||
#Develop a matchins electrical generator ($150) | |||
#Integrate additional steam cycle components - cooling, pumping, preheating, superheating ($150) | |||
See [[OS2 Development Points]] for details. | |||
Prior to the Convergence, we need to have the components to be tested. | |||
[[OS2]] will include the synthesis of the system into a working whole, as we will watch the steam engine spin and power being generated from the generator head. |
Revision as of 18:42, 2 February 2009
Introduction
This page is dedicated to organizing all the aspects of the preparation for Open Solar 2 - OS2 - The Second Solar Power Generator Convergence at Factor e Farm.
The main points are to refine the design of the system and prepare all the materials for integration.
The points to develop prior to OS2 are:
- Demonstrate a working reflector slat. This includes (including cost milestones for materials):
- Structure for holding mirrors ($6 per slat, without mirrors)
- Mirror attachment strategy ($1 per slat)
- Conrol electronics, motor, feedback sensor, and control logic ($5 per slat)
- Develop an explicit design for the collector tube ($500)
- Source materials
- Develop valving system for collector tube feedwater entry ($150)
- Develop digital fabriction of steam engine ($100)
- Modernize said steam engine with electronic steam injection ($50 for valve and controls)
- Develop a matchins electrical generator ($150)
- Integrate additional steam cycle components - cooling, pumping, preheating, superheating ($150)
See OS2 Development Points for details.
Prior to the Convergence, we need to have the components to be tested.
OS2 will include the synthesis of the system into a working whole, as we will watch the steam engine spin and power being generated from the generator head.
Pages in category "OS2"
The following 14 pages are in this category, out of 14 total.