XM CAD Flash Mob Strategy: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 7: Line 7:
=Optimal Scenario: CAD Flash Mobs=
=Optimal Scenario: CAD Flash Mobs=


In the optimal scenario - a virtual meeting may be held and this meeting results in complete CAD generation in a 2 hours. This is possible when measurements for a complete device are available - as taken via 3D scanning or physical measurement.
In the optimal scenario - a virtual meeting may be held and this meeting results in complete CAD generation in a 2 hours. This is possible when measurements for a complete device are available - as taken via 3D scanning (see [[XM_3D Scanning Strategy]] or physical measurement.






[[Category:XM]]
[[Category:XM]]

Revision as of 04:15, 23 April 2012

Introduction

In general, the key strategy of OSE is Breakdown as in the SEBD (including Interface Design between components). This strategy allows us to create effective and rapid CAD generation.

CAD generation occurs in 3 scenarios: first, for things that haven't been built; second, in the case where 2D design is available, but 3D files are missing; and third, for things that are built already and for which 3D CAD is not yet available. We will focus on the last one - since that is the most prevalent case to date with OSE work. This happens because design changes are usually made during product builds - or iterative builds take off from a last prototype without new CAD being generated.

Optimal Scenario: CAD Flash Mobs

In the optimal scenario - a virtual meeting may be held and this meeting results in complete CAD generation in a 2 hours. This is possible when measurements for a complete device are available - as taken via 3D scanning (see XM_3D Scanning Strategy or physical measurement.