Surveying 101: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 15: Line 15:
=Procedure=
=Procedure=
Shoot vertical intervals first (slope). Set up horizontal intervals (following contours, creates aspect) later. Then put the grid down.
Shoot vertical intervals first (slope). Set up horizontal intervals (following contours, creates aspect) later. Then put the grid down.
*75 ft. grid, starting at SW Corner, working South to North, then West to East
*When 75 ft. grid is complete, transfer information to Sketchup
*25 ft. grid, starting at SW Corner, working South to North, then West to East
*Detail grid transferred to fill in Sketchup rough survey.


*2 foot drop standard. May need to 4' at high slope like 10%.
*2 foot drop standard. May need to 4' at high slope like 10%.


=Design=
=Design=
*Chapter 2-3 Mollison - erosion pattern - dendritic pattern
Design: 5% slope not good for animals, west face not good.
Design: 5% slope not good for animals, west face not good.
""Initial thoughts:""
West strip
*more water, shade
*less erosion
*more established creeks
*proposed use: homesteads, collective gardens, ponds, water storage
East strip from S to N end
*Workshops
*large-scale storage (pole barns, tractor garages)
*greenhouses
*orchard/food forest (swales, trees, vines, edible groundcover)
*pasture, organic shapes with edible fence following swales on contour
*grazeland rotated by species, with cover crop and grain as possible planting scenarios


Ask Parker on full soil report.
Ask Parker on full soil report.

Revision as of 19:52, 10 July 2012

Tools

  • Contractor's site level - shoots vertical intervals - drop in stairstep. Vertical intervals are equal unless there is huge variation in slope. Contractor's level is by Berger at Home Depot.
  • Laser level - online - quickest is Forestry Supply has good options. Robust. No hassle. Self-leveling laser - where you don't have to do a bubble to level. Must have 360 deg compass on it. Laser shoots 360 degrees. Shoots lo less than 1000 feet in shooting length. TopCon brand.
  • Stick - Forestry Supply - 16' stick. Reads in 10ths of inch. Read the back of it, so distance from ground rather than absolute.
  • Weedwhacker + chainsaw. Offset 10' from trees if trees are in the way.
    • Always go in one direction.
    • Need a scale map of property.

Procedure

Shoot vertical intervals first (slope). Set up horizontal intervals (following contours, creates aspect) later. Then put the grid down.

  • 75 ft. grid, starting at SW Corner, working South to North, then West to East
  • When 75 ft. grid is complete, transfer information to Sketchup
  • 25 ft. grid, starting at SW Corner, working South to North, then West to East
  • Detail grid transferred to fill in Sketchup rough survey.
  • 2 foot drop standard. May need to 4' at high slope like 10%.

Design

Design: 5% slope not good for animals, west face not good.

""Initial thoughts:"" West strip

  • more water, shade
  • less erosion
  • more established creeks
  • proposed use: homesteads, collective gardens, ponds, water storage

East strip from S to N end

  • Workshops
  • large-scale storage (pole barns, tractor garages)
  • greenhouses
  • orchard/food forest (swales, trees, vines, edible groundcover)
  • pasture, organic shapes with edible fence following swales on contour
  • grazeland rotated by species, with cover crop and grain as possible planting scenarios


Ask Parker on full soil report.

Resources