Power Cube VII Collaborative Production Run: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "To Tom G: Thanks. See review: http://opensourceecology.org/wiki/Power_Cube_VI_Review So how would you feel about visiting us for 2 days to do a Collaborative Production Run o...")
 
No edit summary
Line 8: Line 8:


I propose we get full cad, fab drawings, fab diagram (see CEB blog post) - and full sourcing - and build in 2 days using a crew of 6 plus you as Guest Production Director? We've had 4-day results on the CEB press, not bad, but absolutely unprepared for and it should take 1 day next time with torch table. That's my plan.
I propose we get full cad, fab drawings, fab diagram (see CEB blog post) - and full sourcing - and build in 2 days using a crew of 6 plus you as Guest Production Director? We've had 4-day results on the CEB press, not bad, but absolutely unprepared for and it should take 1 day next time with torch table. That's my plan.
=Schedule=
Collaborative Production run is slated for Nov 1-2 at present, Thu-Fri.

Revision as of 19:04, 15 October 2012

To Tom G:

Thanks. See review:

http://opensourceecology.org/wiki/Power_Cube_VI_Review

So how would you feel about visiting us for 2 days to do a Collaborative Production Run of Prototype VII?

I propose we get full cad, fab drawings, fab diagram (see CEB blog post) - and full sourcing - and build in 2 days using a crew of 6 plus you as Guest Production Director? We've had 4-day results on the CEB press, not bad, but absolutely unprepared for and it should take 1 day next time with torch table. That's my plan.

Schedule

Collaborative Production run is slated for Nov 1-2 at present, Thu-Fri.