Modular Stove Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
(→Panels) |
(→Panels) |
||
Line 13: | Line 13: | ||
*[2] 3"x42" (ash tray) | *[2] 3"x42" (ash tray) | ||
*[2] 3"x19" (ash tray) | *[2] 3"x19" (ash tray) | ||
<html><img src="https://docs.google.com/drawings/pub?id=1YM56VY5PjQiFPxxLeE5HuW3QlvXSjCNLoCEvlS0hd1o&w= | <html><img src="https://docs.google.com/drawings/pub?id=1YM56VY5PjQiFPxxLeE5HuW3QlvXSjCNLoCEvlS0hd1o&w=600&h=400"></html> | ||
[https://docs.google.com/drawings/d/1YM56VY5PjQiFPxxLeE5HuW3QlvXSjCNLoCEvlS0hd1o/edit edit] | [https://docs.google.com/drawings/d/1YM56VY5PjQiFPxxLeE5HuW3QlvXSjCNLoCEvlS0hd1o/edit edit] | ||
Revision as of 03:16, 17 October 2012
BOM
Start with BOM.
Frame
- [12] - 4' long
- [18] - 2' long
- [6] - 1' long
Panels
Note: undersize panels slightly so they fit within 2'x2' or 1'x2' panel areas.
- [1] 1'x2' (front door of ash chamber)
- [3] 2'x2' (front, top, and flue panel)
- [1] 19"x2' (flame deflector)
- [1] 19"x42" (ash tray)
- [2] 3"x42" (ash tray)
- [2] 3"x19" (ash tray)
Mild Steel
- 1/4"x2"x2" angle - $2.41/ft
- 1/8"x1/2"x1/2" angle - $0.66/ft (or 1/8"x3/4"x3/4" angle)
- 1/8"x4'x8' sheet - $100
Build
Fabrication Diagram
Step 1
Study Concept: 2 boxes with slideable cover plates clamped down. Ash tray and flame deflector plates side in similar fashion.
Step 2
- Cut angle for 2 mitered frames, just like for Power Cube 6. 1/4"x2"x2" angle BOM:
- Use Ironworker for mitered cuts:
- Result: corners fit together such that all metal angle form flat planes
Quality Control
- 3 corners fit so there is no more than 1/8" space anywhere
- length of members within 1/4" tolerance
Then, the build:
Step 3
- Plasma Cut all panels
- Includes ash tray and flame deflector panels
Step 4
- Cut door and panel holders from 1/8"x1/2"x1/2" angle
Step 5
- Weld frame - all 1/4"x2" angle - as this:
- Mitered corners welded, ground flat
- Rails for flame deflector and ash tray are not mitered
Step 6
- Weld all panel holders and door slides
- Weld on holding nuts
Step 7
- Weld ash tray
- Weld handles to doors
Step 8
- Plasma cut flue panel
- Plasma cut flue sections, including damper section
- Plasma cut flue section joints
- Fabricate damper
Step 9
- Lay brick foundation for stove as in Concept Drawing - 4' wide by 5' long, length facing E-W
- Stack ash chamber and burn chamber sections, against rear brick wall in HabLab, stove door facing west, 4 feet from window
- Mount panels and doors
- Insert flame deflector and ash tray
Step 10
- Build up Bricks on 2 sides of Stove
- Install flue
Step 11
- Break flue exit out of glazed door side or through roof