Power Cube VIII Collaborative Production Run: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 8: Line 8:
*Lathe up and running for spline coupler
*Lathe up and running for spline coupler
**Tom has a coupler jig
**Tom has a coupler jig
*Get lathe up and running
*Buy blade for bandsaw
*Inspect engine for proper working condition.


=BOM=
=BOM=
Line 16: Line 13:


=Fabrication Diagram=
=Fabrication Diagram=
<html></html>
<html><img src="https://docs.google.com/drawings/pub?id=1KmkEsN6OPySaH11YeaQg51PJVuTzHqHMuWSajwRU8_4&amp;w=480&amp;h=360"></html>


[https://docs.google.com/drawings/d/1KmkEsN6OPySaH11YeaQg51PJVuTzHqHMuWSajwRU8_4/edit edit]
=Fabrication=


 
Coupler - <iframe width="300" height="169" src="https://www.youtube.com/embed//GDALEaHXt1g" frameborder="0" allowfullscreen></iframe>
[https://docs.google.com/drawings/d/1KmkEsN6OPySaH11YeaQg51PJVuTzHqHMuWSajwRU8_4/edit edit]

Revision as of 23:35, 22 October 2012

Tom is currently building Power Cube VII - optimizing form factor for ergonomics. The power cube after that is Power Cube VIII. See Machine Naming Convention.


Date

Preparation

  • Lathe up and running for spline coupler
    • Tom has a coupler jig

BOM

Fabrication Diagram

edit

Fabrication

Coupler - <iframe width="300" height="169" src="https://www.youtube.com/embed//GDALEaHXt1g" frameborder="0" allowfullscreen></iframe>