OSE Organization Chart: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 10: | Line 10: | ||
==Sequencing Rationale== | ==Sequencing Rationale== | ||
*Currently, we have 2 | *Currently, we have 2 [[Machine Designer]]s. We intend to build our team to 6 machine designers by March. | ||
*When we reach 4 machine designers, we will need to recruit a Product Lead to oversee the Machine Designers | |||
=June, 2012= | =June, 2012= | ||
https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit | https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit |
Revision as of 19:23, 16 November 2012
November, 2012
see other models at Organization
Linked from Shuttleworth Project Pitch - Staff
Sequencing Rationale
- Currently, we have 2 Machine Designers. We intend to build our team to 6 machine designers by March.
- When we reach 4 machine designers, we will need to recruit a Product Lead to oversee the Machine Designers
June, 2012
https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit