MicroHouse 3 - Module - Review
MicroHouse Review Response Form
[ See Responses]
Review Request Document
Review Questions
Download design file - File:MicroHouse3.skp
We are soliciting feedback on the entire design. In particular, we have 3 questions, below. Please use form above to respond.
Question 1
Should the first floor bond beam go around the entire perimeter of the house? Note that the bond beam is split between 2 house levels. Should it go all around the house on top of level 1?
Question 2
Is the mounting of rafters to the upper and lower mid truss strong enough? Currently, there is a bird's mouth connection, but the upper end of the rafter is connected only at the bird's mouth. Should the upper end of the rafter be connected at its whole face?
Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?
Question 3
In what order should the flashing, tar paper, and corrugated roofing be installed?