Alec Log
Active Projects
08/27/2015
Siding on Hablab with Stefania.
Fed The Girls.
08/26/2015
Picked up Stefania from airport.
Fixed RH shower in Hablab (blocked head). Checked out LH shower, which is reversed; some more pex tubing and cinch clamps needed to fix it.
Picked up pickup from M&R.
Cleaned Hablab, laundry from Bulldozer Workshop
Loosened tree guard mesh where it was digging into bark on one tree, still needed on many others.
Picked apples
Fed The Girls
08/25/2015
Change bathroom propane tank at Hablab
Siding with Gary, Chris and Squires
Van breakdown, tow and repair (broken serpentine belt)
Take Kiran & Matthieu to KC
08/17/2015 - 08/24/2015
Bulldozer Workshop
08/16/2015
Hackaday Prize Log Update
08/15/2015
Change bathroom propane tank at Hablab
Workshop
08/14/2015
Hablab tidy-up
Preparing beds for fall garden
Workshop tidy-up
Clean contacts on van battery, replace bolt
Pick up steel at Shweiger
Unload steel
Walmart shopping run
Pick up workshop participants at airport and train station
08/13/2015
Workshop tidy-up
Meeting with MJ, CM re: bulldozer workshop
Walk-through of Hablab exterior with Gary
Drop off truck at M & R Auto
Add project log update to hackaday.io prize entry.
08/08/2015
Tue Aug 4, 2015
Alec Entrepreneur in Residence Agreement - [1]. Alec Work Plan - [2]