SH4 Future Work
Jump to navigation
Jump to search
SH4 Future Work.SH4 Challenges.Collaborative Design 2023
- Investment model - matches S&P but transforms for neosubsistence while reconciles for greed.
- Under stair closet door - redesign for modularity
- Wiring - SH4 has entrance at back left corner. Do a high power panel (100A)for induction, water heater. Do subpanel for light circuits (100A CSED) with meter bypass (using it only as a subpanel). Explore possibility of PoN subpanel. Does this exist?
- Wiring behind fridge - simplify for countertop UC on entire West wall?
- Finish all CAD - make everything interoperable and documented. On Part Library pages with clear instructions on what is what. Requires annotation. Requires file. Collates files in multiple formats. Shows visual representation.
- Dev team ecosystem - CAD and digital Fab with self-labeled parts. Joints in modules, standard parts between modules. This allows us to navigate through low requirement jurisdictions, building up experience for high requirement jurisdictions.