SEH in 5 Trailer Loads

From Open Source Ecology
Revision as of 22:56, 7 June 2023 by Eric (talk | contribs) (Added a Category to the Page)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Loads

  1. Foundation
  2. Floor 1 + subfloor + garage
  3. Floor 2 + roof + PV + House wrap
  4. Interior framing with MEP and Tubs + doors + exterior trim + siding
  5. Insulation + beadboard + flooring + interior trim
  6. Landscaping, waste, water, electrical connection.

Narrative

Get inverter and solar up as soon as possible so that we have power. For the 240V input, use a 240V feed from a small inverter or use small gen with 120-240 Transformer