Audrey Log

From Open Source Ecology
Jump to navigation Jump to search

Modernized Steam Engine Project Plan

Notes from 25 Mar 2013

Notes from 24 Mar 2013


Notes from 23 Mar 2013

  • Analysis of alternatives:
    • Researched bump valve reliability, researching alternative solutions
    • Need to discuss condensation issue and air compression issue on the return stroke (sending note to M. Norton)
    • Power vs pressure: The higher the pressure, the smaller and lighter the engine (weight to power ration)...optimum pressure for SWAP requirements?? Include risk analysis (higher pressure/heat = higher safety risks), probable effect on cost. Continue researching.
  • Reviewing Green Steam Engine products; available at http://greensteamengine.com/products.htm The 2 cylinder product provides 10 hp at 125 psi, 1500 rpms; drawings/instructions/hard to find parts available for purchase. Other products available via COTS: http://greensteamengine.com/ ; will make contact with POC for more info re: 3,4, and 6 cyl eng.

Notes from 22 Mar 2013

  • On travel, no work performed

Notes from 21 Mar 2013

  • Updated project plan general requirements/specs and better defined FMECA process
  • Continued researching alternatives to issues with OSE Arrow Head Engine
  • Explored differences in V-shaped layout/feasibility; assessing

Notes from 20 Mar 2013

  • Contacted Mark Norton; directed to https://sites.google.com/site/phase3project/projects/steam-engine/engine-designs/ose-arrow-head-engine
  • Began researching the following issues with the OSE Arrow Head Engine:
    • Water might condense in the cylinder chamber resulting in a blow-out condition
    • Power output will be low unless operated at high speed and high steam pressures
    • Bump valves are subject to wear and breakage
    • Air is compressed on the return stroke, losing valuable work
    • Horizontal layout leads to excessive wear on parts (piston rings, etc).

Notes from 19 Mar 2013

  • On travel, no work performed

Notes from 18 Mar 2013


Notes from 17 Mar 2013

  • Re-baselined project focus to include work performed by Mark Norton
    • Reviewed OSE Modern Steam Engine documentation and requirements, incorporated into project plan